Version upgrades
Core, PHP and every module moved together, with custom code patched and kept.
Technical improvements
Ari runs version upgrades, security patches, extension fixes and integrations on a copy of your store, then hands you one pull request.
Time
40 hourswith Ari and a developer250 hoursin a typical agency quoteTested
Every pageon a preview store, before anything goes liveSpot checkson staging, if the quote includes itCustom code
Keptpatched for the new version, with its testsRewrittenor dropped, in many quotesCore, PHP and every module moved together, with custom code patched and kept.
Apply the September patchnorthfield-store.com
Applied and checked on a copy of your store, then sent for review.
Modules that break each other after an update, found and fixed one at a time.
Reproduced on a copy of your store, traced to the cause and fixed.
Images resized, scripts deferred and the cache warmed, measured before and after.
Send new orders to the ERP and bring back stock and trackingnorthfield-store.com
The connector upgraded or fixed, with its field mapping tested both ways.
One sentence, in your own words. Ari says what it found and what it will do, and you can ask for the technical outline before anything starts.
How a change is made →Versions, the compatibility code a previous vendor left behind, and which modules have a release for the target version. Nothing is touched yet. The audit is the first thing you get, and you can stop there.
The target version, PHP, and every module and its requirements, resolved together. Where a compatible release exists, it is used. Where none exists, the module goes on the patch list.
Custom modules and abandoned extensions are patched to the new APIs and kept, with their tests. Your customizations survive the upgrade.
Composer, setup:upgrade, compilation, static content, reindex and the test suites, on the copy of your store. The live store and its database stay exactly as they are.
Security and access →Every page type on every store view, the checkout with a test order, the emails, and the admin screens your team uses, with screenshots. Anything that breaks is in the report before you see it.
The full diff, a module report, the screenshots, and the checks already green. Your developer reviews and merges it like any other branch, and it goes through your own staging and release.
Contact sales →Upgrade us from 2.4.6 to 2.4.9 and tell me what breaks.
You run 142 modules on PHP 8.1. I will read them first, then resolve, patch and run the upgrade on the copy of your store. The first read takes about 20 minutes. Do you want the technical outline before I start?
Yes, send the outline first.
amasty/shopby2.16.4conflicts with 2.4.9klarna/m2-payments8.1.0no 2.4.9 release yetacme/module-legacy-import1.4.2custom, unmaintainedmageplaza/smtp4.1.0outdatedmirasvit/module-seo2.9.1outdatedari/upgrade-2.4.9 into mainAri connects to payment, shipping, ERP, PIM, search and marketing platforms through their Magento modules and APIs. Ari reads the module and its documentation first, and tests the connection on a copy of your store.
Any store on 2.3 or 2.4, on Magento Open Source or Adobe Commerce, up to 2.4.9.
No. The upgrade runs on a copy of your store, and a person merges and releases it.
Ari patches it for the new version and keeps its tests. Custom modules are patched the same way.
A typical upgrade takes about 40 hours with Ari and a developer. An agency usually needs around 250 hours for the same job.
An upgrade uses a few hundred task credits, out of the 2,000 a month in the $99 plan.
Pricing
Enterprise plans carry custom volumes and terms. Contact sales, or read what it costs and how it works.